Engineering

TRAGEN Engineering enhances railway system safety, quality, and sustainability
through engineering design, precision testing, and advanced component development.

Railway Engineering Design

TRAGEN Engineering achieves the highest level of safety and quality in railway systems,
as well as sustainable growth, through railway engineering design, precision safety and testing services,
and the development and supply of railway components.

  • Track, Rolling Stock, Inspection, and Operations Management Integrated Design Covering All Areas

    TRAGEN views the entire railway system as a single integrated process. By organically linking all areas—track, rolling stock, inspection, and operations—we provide comprehensive engineering solutions that consider everything from the design phase to operational efficiency.

  • From Establishing Design Standards to Optimal Operation Simulation

    TRAGEN establish a precise design system based on domestic and international railway specifications and safety standards, and validate various operating conditions through simulation. We completes a stable and efficient railway operating environment through optimal operation analysis and verification processes based on data.

Major Railway Engineering Project Achievements

Performance Areas Project Name Main Content
Operation and Management Daejang~Hongdae Metropolitan Railway Driving Performance Simulation
Design Daejeon Metro Line 2 Vehicle Operation System Selection
[Inspection Field] Technical Proposal
Operation and Management Wolbae~Ansím Integrated Relocation of Vehicle Base
National Industrial Park II Route Extension Project
Planning, Design, and Route Extension Operation Plan Development
Design Hadan~Noksan Line Driving Operation Plan Design
Design Ultra-Lightweight Tram Vehicles for Small and Medium-Sized Cities Requirements Design and Specification Definition
Design Chuncheon/Gunsan Tourist Trams Operation and Maintenance (Proposal) and Cost Calculation
Design Oryukdo Line Wireless Tram Basic and Detailed Design for the Demonstration Route
Design Busan North Port Phase 1 (C-Bay~Park) Basic System Plan Design
Design San José, Costa Rica Metropolitan Rail Transit Inspection/Machinery Field Feasibility Review
Operation Plan Tram Related to the Transition to a Green Transportation System of Cheongju Feasibility Study on Operation and Maintenance
Business Plan Tourism Tram of Jeonju Development of Operation Strategy and Cost Calculation
System Engineering System Engineering Implementation Legislation Survey and Analysis of the Current Status
System Engineering Hitachi On-board Signal Systems Safety Case Advisory for Specific Areas
System Engineering Tram SE-Based Operation Scenarios Establishment and Verification
System Engineering New Transit Systems (tram) Engineering Services Establishment of Comprehensive System Engineering
System Engineering Busan North Port Phase 1 (C-Bay~Park) Basic and Detailed Design SE

JOIN THE TRAGEN

We welcome inquiries from partners and customers interested in collaborating
on global railway projects and innovative solutions.

Privacy Policy

  • Article 1 (Consent to the Collection of Personal Information)

    When users of TRAGEN Co., Ltd. click the “Agree” button on the company’s Privacy Policy or Terms of Use, it is deemed that they consent to the collection of their personal information.

  • Article 2 (Items of Personal Information Collected)

    The following personal information is collected for consultation through online inquiries.
    Items collected: Name, Phone number, Email

  • Article 3 (Purpose of Collecting and Using Personal Information)

    The company does not disclose users’ personal information without prior consent and collects such information for smooth customer consultation and service provision. All information is used solely for the purposes described above, and if the scope, purpose, or use of the collected information changes, prior consent will be obtained.

    Name: Identity verification for consultation
    Phone number: Delivery of consultation-related and event notifications, and provision of information on new services and updates (via DM, SMS, email, etc.)
    Users may refuse to consent to the collection and use of personal information.
    However, refusal may limit access to online inquiry consultations and certain services or benefits.

  • Article 4 (Retention and Use Period of Personal Information)

    In principle, personal information is destroyed without delay once the purpose of its collection and use has been accomplished. If it is necessary to retain certain information in accordance with relevant laws and regulations, the company will store the information for the period specified by those laws.

    Records on contracts or withdrawal of contracts: 5 years (Act on Consumer Protection in Electronic Commerce, etc.)
    Records on consumer complaints or dispute resolution: 3 years (Act on Consumer Protection in Electronic Commerce, etc.)
    Records on the collection, processing, and use of credit information: 3 years (Credit Information Use and Protection Act)

    Personal information printed on paper is destroyed by shredding or incineration.
    Personal information stored in electronic file form is deleted using technical methods that prevent recovery.